ECSA engineering fee calculator

Calculates the guideline professional fee for engineering services under the ECSA Guideline Scope of Services and Professional Fees (Gazette 52691, 16 May 2025). It covers all eight discipline and project-type tables, reinforced concrete and structural steel (Table 2), category factors, and the Table 9 stage apportionment.

The spreadsheet many firms use returns #N/A on every building project and swaps the civil and mechanical building scales. This calculator follows the gazette.

Discipline and project

Discipline and project type together select the gazetted fee table and the stage apportionment.

Fee table
ECSA Table 1
Fee bracket
Lump sum or time-based
Basic fee on the works
R 0,00

Concrete and structural steel

ECSA Table 2 — an additional design fee on the reinforced concrete and structural steel portions, inclusive of pro-rata preliminary and general amounts.

Category factors

Tables 2A to 8A. The basic fee is multiplied by the factor for each applicable description; where more than one applies, the effective factor is their product.

Work Stages

Specify percentage adjustments for the project or per stage.

Specify which stages and deliverables per stage are applicable. Use the drop-down button next to each stage.

Select the default deliverables under each stage as required. Deliverable percentages are fixed shares of the stage.

Legend: P = Partial service (not all deliverables selected).

Stage / DeliverableWeightingApplicableReductionGuideline FeeAdjusted Fee
Default (all stages)
%
Stage 1 - Inception
5%
%
R 0,00R 0,00
Stage 2 - Concept & Viability
Preliminary design
25%
%
R 0,00R 0,00
Stage 3 - Design Development
Detailed design
25%
%
R 0,00R 0,00
Stage 4 - Documentation & Procurement
25%
%
R 0,00R 0,00
Stage 5 - Contract Administration & Inspection
15%
%
R 0,00R 0,00
Stage 6 - Close Out
5%
%
R 0,00R 0,00
Total Fee (Excl. VAT)R 0,00R 0,00
Fee as percentage of works value——

Summary

Basic design feeR 0,00
Fee for applicable stagesR 0,00
Total fee (excl. VAT)R 0,00
VAT15%R 0,00
Final fee total (incl. VAT)R 0,00
Guideline fee (excl. VAT)
R 0,00

Questions

Which table does my project use?
Civil and structural work on a building project uses Tables 3 and 4; mechanical and electrical work on a building project uses Tables 7 and 8. Engineering projects use each discipline's own table.
How do category factors combine?
They multiply the basic fee and compound as a product. They are not separate uplifts on the works value added together.
What happens below R1 000 000?
The gazette prices those projects as a lump sum or on time, so the calculator says the fee is time-based rather than producing a scale figure.
What is the partial-service uplift?
Clause 4.2.9: when not all stages are provided, the fee is the sum of the applicable stages plus 10 percentage points. It is on by default and can be switched off.
Can I share or save a calculation?
The page address updates as you type, so “Copy share link” gives anyone the same calculation. To keep it with a project and turn it into a proposal, create a free Quebik account.