Free tool · Architects

SACAP architect fee calculator

Calculates the guideline professional fee for architectural services under SACAP Board Notice 885 of 2026 (Gazette 54218, 27 February 2026). Pick a complexity, enter the value of the works, choose the stages you are appointed for, and the fee is apportioned stage by stage.

It corrects several errors in the widely shared spreadsheet, including negative fees on additions, repeated buildings priced too low, and later stages priced at zero. Each adjustment shows the clause it comes from.

Project

Complexity selects the gazetted fee scale. Typology, sub-type and level of luxury are recorded on the estimate but do not change the fee.

Value of works

The construction budget for fee purposes excludes VAT, contingencies, other consultants' fees and escalation (clause 15(d)).

Total building area
0 m²
Estimated development cost
R 0,00
Fee bracket
Time-based

Repeated buildings

Clause 23: repeated prototypes under a single contract are billed at 35% of the fee for stages 1 to 4, with the full fee payable on stages 5 and 6.

Work on existing buildings

Clauses 20 to 22 increase the fee on the affected portion of the works. Enter the value of that portion — the uplift is calculated on the guideline fee for it, not on the works value.

ZAR
—
ZAR
—
ZAR
—

Work Stages

Specify percentage adjustments for the project or per stage.

Specify which stages and deliverables per stage are applicable. Use the drop-down button next to each stage.

Select the default deliverables under each stage as required. Deliverable percentages are fixed shares of the stage.

Legend: P = Partial service (not all deliverables selected).

Stage / DeliverableWeightingApplicableReductionGuideline FeeAdjusted Fee
Default (all stages)
%
Stage 1 - Inception
2%
%
R 0,00R 0,00
Stage 2 - Concept & Viability
Concept design
15%
%
R 0,00R 0,00
Stage 3 - Design Development
20%
%
R 0,00R 0,00
Stage 4.1 - Documentation & Procurement
Local authority documentation and approval
10%
%
R 0,00R 0,00
Stage 4.2 - Documentation & Procurement
Technical documentation and tender
20%
%
R 0,00R 0,00
Stage 5 - Construction
30%
%
R 0,00R 0,00
Stage 6 - Close Out
3%
%
R 0,00R 0,00
Total Fee (Excl. VAT)R 0,00R 0,00
Fee as percentage of works value——

Summary

Basic design feeR 0,00
Total fee (excl. VAT)R 0,00
VAT15%R 0,00
Final fee total (incl. VAT)R 0,00
Guideline fee (excl. VAT)
R 0,00

Questions

What goes into the value of works?
The construction budget excluding VAT, contingencies, other consultants' fees and escalation (clause 15(d)). Garden areas and fencing are external works and are excluded from the fee base.
Why is my fee lower when I deselect stages?
Each stage carries its gazetted weighting, and deselected stages are not redistributed across the others (clause 15(c)). Three of seven stages is that share of the fee, not the whole fee.
How are alterations and additions priced?
Clauses 20 to 22 increase the fee on the affected portion of the works by 30% or 40%. The calculator prices the guideline fee for that portion and adds only the uplift.
How do repeated buildings work?
Under clause 23, each repeat is billed at 35% of the fee for stages 1 to 4, with stages 5 and 6 at the full fee.
Can I share or save a calculation?
The page address updates as you type, so “Copy share link” gives anyone the same calculation. To keep it with a project and turn it into a proposal, create a free Quebik account.