SACAP architect fee calculator
Calculates the guideline professional fee for architectural services under SACAP Board Notice 885 of 2026 (Gazette 54218, 27 February 2026). Pick a complexity, enter the value of the works, choose the stages you are appointed for, and the fee is apportioned stage by stage.
It corrects several errors in the widely shared spreadsheet, including negative fees on additions, repeated buildings priced too low, and later stages priced at zero. Each adjustment shows the clause it comes from.
Project
Complexity selects the gazetted fee scale. Typology, sub-type and level of luxury are recorded on the estimate but do not change the fee.
Value of works
The construction budget for fee purposes excludes VAT, contingencies, other consultants' fees and escalation (clause 15(d)).
Repeated buildings
Clause 23: repeated prototypes under a single contract are billed at 35% of the fee for stages 1 to 4, with the full fee payable on stages 5 and 6.
Work on existing buildings
Clauses 20 to 22 increase the fee on the affected portion of the works. Enter the value of that portion — the uplift is calculated on the guideline fee for it, not on the works value.
Work Stages
Specify percentage adjustments for the project or per stage.
Specify which stages and deliverables per stage are applicable. Use the drop-down button next to each stage.
Select the default deliverables under each stage as required. Deliverable percentages are fixed shares of the stage.
Legend: P = Partial service (not all deliverables selected).
| Stage / Deliverable | Weighting | Applicable | Reduction | Guideline Fee | Adjusted Fee |
|---|---|---|---|---|---|
| Default (all stages) | % | ||||
Stage 1 - Inception | 2% | % | R 0,00 | R 0,00 | |
Stage 2 - Concept & Viability Concept design | 15% | % | R 0,00 | R 0,00 | |
Stage 3 - Design Development | 20% | % | R 0,00 | R 0,00 | |
Stage 4.1 - Documentation & Procurement Local authority documentation and approval | 10% | % | R 0,00 | R 0,00 | |
Stage 4.2 - Documentation & Procurement Technical documentation and tender | 20% | % | R 0,00 | R 0,00 | |
Stage 5 - Construction | 30% | % | R 0,00 | R 0,00 | |
Stage 6 - Close Out | 3% | % | R 0,00 | R 0,00 | |
| Total Fee (Excl. VAT) | R 0,00 | R 0,00 | |||
| Fee as percentage of works value | — | — | |||