Calculates the guideline professional fee for quantity surveying services under the SACQSP 2024 Guideline Tariff of Professional Fees (Board Notice 741 of 2025, Gazette 52152, 21 February 2025, effective 1 May 2024). The basic fee is taken from the clause 2.2.1 scale, multiplied by the appropriate percentage for the service, and apportioned to stages under clause 2.7.

It handles mixed contracts the way clause 2.1.2 requires: one basic fee on the whole value, apportioned to each category before its percentage is applied, rather than restarting the scale for each part.

Service

The service and category select the appropriate percentage applied to the basic fee, and the clause 2.7 row that apportions it to stages. The tariff does not differentiate by building type or complexity (clause 1.4).

Value for fee purposes

Clause 10.49: the final value of the contract, or a fair estimate, including preliminaries, contract price adjustment and specialist installations, and excluding VAT and contingencies.

ZAR
Value for fee purposes
R 0,00
Fee bracket
Time charge
Basic fee
R 0,00

Contract make-up

Where one contract includes more than one category, the basic fee is apportioned to each pro rata by value before its percentage is applied (clause 2.1.2). Enter the parts of the value for fee purposes that fall in each.

Work Stages

Specify percentage adjustments for the project or per stage.

Specify which stages and deliverables per stage are applicable. Use the drop-down button next to each stage.

Select the default deliverables under each stage as required. Deliverable percentages are fixed shares of the stage.

Legend: P = Partial service (not all deliverables selected).

Stage / DeliverableWeightingApplicableReductionGuideline FeeAdjusted Fee
Default (all stages)
%
Stage 1 - Inception
5%
%
R 0,00R 0,00
Stage 2 - Concept & Viability
10%
%
R 0,00R 0,00
Stage 3 - Design Development
15%
%
R 0,00R 0,00
Stage 4 - Documentation & Procurement
40%
%
R 0,00R 0,00
Stage 5 - Construction
25%
%
R 0,00R 0,00
Stage 6 - Close Out
5%
%
R 0,00R 0,00
Total Fee (Excl. VAT)R 0,00R 0,00
Fee as percentage of works value——

Summary

Basic feeR 0,00
Fee at appropriate percentageR 0,00
Total fee (excl. VAT)R 0,00
VAT15%R 0,00
Final fee total (incl. VAT)R 0,00

Disbursements (clause 8) are claimable in addition to the fee and are not included here.

Guideline fee (excl. VAT)
R 0,00

Questions

What is the value for fee purposes?
The final value of the contract, or a fair estimate, including preliminaries, contract price adjustment and specialist installations, and excluding VAT and contingencies (clause 10.49). For building work, ancillary mechanical, electrical and civil works are excluded where the quantity surveyor only incorporates information from others; for engineering work, the supply cost of major plant is excluded.
How are alteration works and new work in one contract priced?
Clause 2.1.2: the basic fee is calculated on the whole value, then split between the categories in proportion to their value, and each share is multiplied by its own appropriate percentage — 140% for alteration works with bills of quantities, 100% for new building work.
How does replication work?
Prototypes and other non-replicated work take the normal appropriate percentage; each replication of a prototype is charged at 60% of it. Replication does not apply to cost-plus contracts, and the replication fee is apportioned to stages on its own clause 2.7 row.
What changes with multiple procurement contracts?
Where at least 10 subcontracts or direct contracts exceed 40% of the value (clause 10.25), the fee increases by 10% with a principal contractor or 20% without one, and the clause 2.7 apportionment for multiple procurement contracts replaces the normal one.
What is the adjustment factor?
Clause 2.2.2 allows the fee to be increased or decreased for risk, complexity, market conditions and the like. The gazette leaves it to be assessed, so the calculator defaults to 100%.
Are disbursements included?
No. Disbursements are claimable in addition to the fee under clause 8, and time charges (clause 7) are agreed separately.